| snippet:
|
Floodlines for the Berg River |
| summary:
|
Floodlines for the Berg River |
| accessInformation:
|
Royal HaskoningDHV, ASP Technology (Pty) Ltd, DEA&DP |
| thumbnail:
|
|
| maxScale:
|
5000 |
| typeKeywords:
|
[] |
| description:
|
<DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>Hydrological and hydrodynamic modelling study to determine the recurrence interval floods and flood levels of the Berg River Estuary.</SPAN></P><P><SPAN>The aims of the study were to determine recurrence interval flood hydrographs at the estuary which were routed hydro-dynamically through the estuary to obtain floodlines at the Berg River Estuary. Floods to be investigated included the 20, 50 and 100 year floods, with and without climate change impacts.</SPAN></P><P><SPAN>The flood hydrology for this study was carried out by using probabilistic, deterministic and empirical methods.</SPAN></P><P><SPAN /></P><P><SPAN>Publication Date: February 2014</SPAN></P></DIV></DIV></DIV> |
| licenseInfo:
|
|
| catalogPath:
|
|
| title:
|
DEADP_Floodlines_Berg_v2 |
| type:
|
|
| url:
|
|
| tags:
|
["Berg River","Floodline","Estuary"] |
| culture:
|
en-US |
| portalUrl:
|
|
| name:
|
|
| guid:
|
|
| minScale:
|
150000000 |
| spatialReference:
|
|